A little weathering and streaking on that concrete wall. You can see the difference between the newer wall on the left and the older wall on the right.
I added the gravel access drive to the west side of the Power House as well as the Pump House. I also replace the concrete pads in front of the doors of the Power House.
A closer view of the Pump House as installed. Like all my structures this is removable. It is secured to its foundation by a sheet metal screw from below.
This vacant area between the fuel tank and the green & white building will have a chain-link fence that runs from the front edge almost to the concrete wall that holds up the rail siding. There is actually a 3' deep ditch at the wall and the fence will turn right at the top of the ditch. The seam between the two module frames is also visible just to the right of the tank foundation. I'll place the fence about an inch to the right of the seam. This corner will then be filled with young trees and undergrowth as is typical of older industrial sites.
No comments:
Post a Comment