With the deck reinstalled and the first round of weathering complete it's time to reinstall the guardrail in front of the office, install edge timbers and cleats to tie down a barge or carfloat.
In the image above I tried some black weathering power between the rails to represent oil from locomotives. I'm not sold on the effect and am looking for alternatives.
I still need a track bumper or something.
I added 2 cleats to the pile wall on the opposite side of the slip. The locations for mounting the cleats were built in when I first assembled the wall.
No comments:
Post a Comment