This track arangement is intended for two operators at the same time. Operator #1 uses the outside main track as a switching lead and has access to (2) storage tracks, a runaround, the industries and the carfloat without blocking the #2 operator from using their switching lead. The second operator can use the inside main track as a lead, has (2) storage tracks, a longer runaround, access to the carfloat without blocking the #1 operator from using their switching lead and access to any industries on the industrial branch (the 3rd track from the left at the frontier).
No comments:
Post a Comment