Search This Blog

Monday, June 27, 2011


Here are the frames with track on them. My very good friend Joe Balint enjoys handlaying track. So in exchange for my painting and detailing some of his structures, he builds track for me. All the switches are handlayed as are some of the sidings. Micro Engineering flex track was use as much as possible. Rail sizes are code 70 for the primary runaround/yard throat and float apron lead. The remainder is code 55.





This track arangement is intended for two operators at the same time. Operator #1 uses the outside main track as a switching lead and has access to (2) storage tracks, a runaround, the industries and the carfloat without blocking the #2 operator from using their switching lead. The second operator can use the inside main track as a lead, has (2) storage tracks, a longer runaround, access to the carfloat without blocking the #1 operator from using their switching lead and access to any industries on the industrial branch (the 3rd track from the left at the frontier).

No comments:

Post a Comment