The large manufacturing plant will include it own power house. The power house has the most elevated track on the module. This is to suggest that in the past the track had a coal pocket below, which has since been filled in when the boilers were converted to oil. So now it receives oil in tank cars, which I haven't often seen modeled. (Now that I think of it.. I don't recall ever seeing an oil fired power plant modeled)
I used Walthers "Cornerstone Modulars" for the walls and was very, very pleased. I have been using DPM modular walls for years so this process isn't new to me. In my opinion, The Walthers product assembles easier, looks better, and is more versatile then the DPM product. I am looking forward to using the "Cornerstone Modulars" in the future. My ultimate plan for the structure is to light it, inside and out, have some interior, and finally to have a working smokestack. I have have a great smoke generator for years and this will be my first chance to really use it.
The non-rail side of the power house has the most interesting features, unfortunately the side that I'll operate the yard from is the other side. At this point the structure is completely assembled and I had begun the weathering on the roof.
A closer look at the roof shows the rusty metal. This was the first time I had used this particular combination artist acrylics colors. Following an article in a magizine (I don't remember where) I used a combination of
Burnt Siena, Raw Siena, and Red Oxide.
I have since added a fourth color to that mix, Burnt Umber. The Burnt Bumber adds the look of old pitted rust. I'll have to point out an example of using the Burnt Bumber in a later posting.
The main loading dock and steps are straight from the Walthers kit, I used a sharp knife to scar up the edges and create the look of old concrete. For concrete color I really like Testors "light aircraft grey" as a starting color, and then weather it from there.
Most of these photos show empty window openings where this photo shows the windows in the open position. I temporarily taped the open windows in place for a couple of photo shots. Because they are fragile, I won't install them until I'm very close to finishing the structure. I had to use two window castings to create one open window and because of this I'm all out of castings.
The yard opertors side doesn't have much detail and I really wanted to have a couple of open windows on this side but I ran out of extra window frames. The blank wall on the far right is the end of the building that would have the boiler. I'm hoping to fit a brass tube through the small chimney to have "smoke" coming from it as well as the main smoke stack. The detail that will be on this side will be the piping for unloading the tank cars.
The blank wall on the left corner will have the smoke stack on front of it. I'm aiming for a stack thats about 17" tall, maybe a bit taller. I have a flashing beacon kit I hope to put in the smokestack.