National Docks Railway
Pages
(Move to ...)
The Concept
Maps
The Modules
Structures
Yard Ballast
Staying in Gauge
▼
Sunday, July 5, 2020
Walkway completion
›
The walkway and pipe networks are complete. Here are some final details and images. In the image above I have removed the walkway,...
Friday, July 3, 2020
Chemical unloading pipe, weathering cross ties, and starting fence construction.
›
At the end of the siding for fuel delivery is space to spot 1 tank car of chemicals of some sort. So I need a different pipe for unloading ...
Thursday, May 21, 2020
Fuel for the Power House Part IV
›
Finishing off the corner of the module where the fuel tank is located is mostly done, just some details to add. Here are some images of the ...
Saturday, May 9, 2020
Fuel for the Power House part III
›
The first section of the fuel pipe walkway is painted. I used a Rust-oleum Metallic from a rattle can. It is basically silver. Here i...
Thursday, April 23, 2020
Fuel for the Power House part II
›
The oil pipeline has been assembled, painted and weathered. The image below shows how it will look once installed permanently. For now its p...
Saturday, April 18, 2020
Fuel for the Power House
›
The Power House for the large industry on this scene has an oil fired boiler and that boiler uses enough oil to purchase by the tank car loa...
Thursday, January 2, 2020
New Years Tour
›
I was tinkering with the camera yesterday and decided to create a photo tour of the Waterfront in its current condition. This is what o...
›
Home
View web version