Search This Blog

Thursday, January 2, 2020

New Years Tour




I was tinkering with the camera yesterday and decided to create a photo tour of the Waterfront in its current condition. This is what on operator would see as a local arrives to service local customers.

RS-3 powered local rolls past the end of 11th street into the yard.

The train approaches the end of the receiving track.





The locomotive stops just clear of the switch. The crew will run the RS-3 out onto the wood deck pier (that I just rebuilt) to clear the switch points, then proceed to the rear of the train to sort the cars into the yard. The switch lead on the pier is long enough for 3 B-B locomotives to clear the switch points.

The brick building in the background is the powerhouse for the future General Foods plant. The green structure with the conveyor is the Metro Concrete mixing building. The structure in the foreground is the remains of a partially demolished concrete coal trestle, now the storage yard of a construction company.

A better view of the end of the yard and float apron. The vacant area behind the GF power house will be occupied by the GF manufacturing building which will be about 3 times the size of the power house.


The grey area between the track and the edge of the module frame is an asphalt parking lot I just painted. I'll add paint stripes, wheel stops and a chain-link fence. It'll look more like a parking lot then.





Here is a view of the arriving train from a higher perspective.



Sunday, October 27, 2019

Pier Deck Rebuild Part II



With the deck reinstalled and the first round of weathering complete it's time to reinstall the guardrail in front of the office, install edge timbers and cleats to tie down a barge or carfloat.











In the image above I tried some black weathering power between the rails to represent oil from locomotives. I'm not sold on the effect and am looking for alternatives.


I still need a track bumper or something.


I added 2 cleats to the pile wall on the opposite side of the slip. The locations for mounting the cleats were built in when I first assembled the wall.

Saturday, October 5, 2019

Pier Deck Rebuild

I've spent most of the last 3 years building scenery on other peoples modules. I don't post anything on those projects here, or anywhere else either. Last week I unloaded the Waterfront modules from the trailer and assembled them in the living room. Time for some maintenance and the continuation of some projects. For maintenance, one rail in the turnout to the float apron lifted off the PC ties it was soldered to. Rather than re-solder it I hand spiked the rail as recommended by Joe Balint who built all the track for me.

Now for completing a project. There are 2 piers on this module, the large generic factory (which has existed as a paper mock-up) is on pier #12 to the North. The tail track for the large run-around is on a narrow pier (#11) to the south with the car float slip between. When I originally built the deck on pier 11, I used sheets of Bass wood and drew and painted the the planks. Afterword I allowed the sheets to dry a couple of weeks so that they wouldn't shrink after installation and leave gaps between them.
Didn't work, After about a year the sheets shrank. It looked bad enough that I removed the sheets, leaving the bare plywood deck.



The Car float office has been removed and resting on the tracks on the other side of the slip. I don't want any paint or weathering color to get on the office building, so removal is necessary. I also had to remove the guardrail in front of the office because the guardrail posts were set into the last piece of the original wood pier deck. For the new pier deck I'm using Evergreen Polystyrene sheet "Car Siding" part # 2067. The label says it's O scale 3-1/4" spacing, but it gives me something close to 7" wide planks in HO scale. I was looking to get 8"-10" planks on the deck but this will have to do.



The new styrene deck has been glued down, all the weights I used are sitting in the float slip. The styrene sheets were painted with grey automotive primer before installation. Then a wash of acrylic Raw Umber was applied, followed by a heaver wash or Burnt Umber. This gives the planks some color variation which I will add to in the next step. 




For the next step I added the last color called "Linen" (Folk Art brand) to some individual planks. The color is a dark almond. For applying the color I placed a couple of drops in an artist paint dish then added 1 drop of diluted ammonia but didn't mix it into the paint, I only used the thinner to dilute the paint already on the brush. This produces a wash of varied opacity when I applied it to the individual planks. Not all planks receive the wash, only about 30%. Also, I mostly applied the wash to only parts of a plank; for example the ends or only the middle, blending the wash into the previous color. And I would often vary the opacity of the wash on an individual plank.


So now a sheet looks more like individual planks.
I'm NOT adding nails.
The last step took me 3 hours.
Next, adding 10' long 8"x 8"s to the edge of the pier just behind the piles.

Saturday, February 24, 2018

Dollar Drugs on Sullivan Ave Part II



I've been working on the foundation of the adjacent Western Auto Parts store. The materials and technique are the same as what I used on the drug store.


 The combined building foundation/sidewalk is different from what I did for the drug store because I didn't have enough material for a solid block. However I didn't need a solid block anyway, the slope of the road combined with the shorter frontage did not require the deeper sidewalk.

Here is the foundation during the test fitting. The smoothing and painting of the concrete surface is next.

The two foundations fit well. Finishing and weathering will blend them together even more.



The business signs have been temporarily removed so that I can install additional details on the structures. The window awnings on both buildings can be seen in this view.

Before I installed the awnings on the corner building, I created two roof drains from styrene.

In addition to the window awnings (2 of which are on the back side), I added a door awning, three electric meters with conduit and a AT&T connection.





The Western Auto building received some additional detail also. I blanked out three windows, added an awning (opposite side), and electric meter with AT&T connection and a basketball backboard. The round object to the left of the backboard is an old security bell from a previous tenant.


The roads still have to be brought up to the final elevation among other things. I also need to install a storm grate uphill and left of the curve in the sidewalk. Then install a railing on the sidewalk to keep pedestrians from falling into the street. Oh and re-install the business signs.





Sunday, February 11, 2018

Dollar Drugs on Sullivan Ave

It has been way to long since I have posted anything. But I have been working on modules belonging to other people and I don't post that stuff here. Maybe someday I'll make another blog for when I work on peoples models.





This is an old image but it gets us back to where I am currently working. I have the Dollar Drug store on the street corner with a Western Auto Parts store to it's left. I am going to have to come up with a name for the connecting street...


The sidewalk base for the drug store is a thick piece of basswood seen here set into the foam landscape. I had to cut all the way down to the wood deck of the module to get a flat surface for the base. The roads are in the foreground and you can see how Sullivan Ave drops down grade after crossing the railroad as it approaches the front edge of the module. I will use some strip basswood to create a foundation for the building on this sidewalk base.




After constructing and test fitting the foundation, I used Elmers wood filler as a skim coat in the sidewalk base and building foundation.





The wood filler is applied very thin. I like to use a wet finger to spread it around. The wood filler literally fills in the wood grain.


Once I have sanded the base I painted it using Testors Light Aircraft Gray out of a rattle can. The expansion joints and cracks are drawn with a 3mm pencil. Then it is sealed so the pencil work isn't smudged during weathering.

Next will be the sidewalk base and foundation for the Western Auto Parts store.





Saturday, June 25, 2016

502 Sullivan Ave. Part III

House construction is complete. Now I'm adding some details with more to come.



I need to find a good place to attach a TV antenna. The rear foundation work in also complete. I will blend the drive into the garage slab with gravel.



The front foundation still need to be worked out as does the walkway to the road.






Tuesday, May 31, 2016

502 Sullivan Ave. Part II

I am way behind on posting updates so I'm going to just get to it.
I've been constructing a concrete walk/stairway along the back of the house. This allows the residents to go from the deck to the back yard and garage area. For material I used Basswood strip narrowed to 3' wide. The first image shows the stairway in place.



With the stairway removed and resting on the building foundation you can see how I carved away the foam scenery to fit the stairway. The Basswood has yet to be finished or painted.


Here I'm test fitting the stairs to the deck and you can see the overall arrangement with the house in place.


And now the concrete has been finished and painted but not yet weathered.



My next post will have the completed house with some detailing.