Well maybe the post title is a bit deceiving, I don't model anything that looks new. As bad as it looked, the damage to the yard office was easily fixed. Only one piece of wood was broken and even then, it wasn't in two pieces. A little white glue fixed it. The rest was just reassembly of the stairs and platform.
I had added the TV antenna a few weeks ago. If you look closely you may see the TV cable from the antenna going into the window. The antenna is N-scale etched steel by Gold Medal Models.
Search This Blog
Tuesday, January 31, 2012
Tuesday, January 24, 2012
Ouch!!
On Sunday last I notice that the model Yard office was lying on it side but still on the module. Upon closer examination I could see that my cat, (who will remain unnamed to protect the guilty) had apparantly launched herself up onto the module and landed on the wooden kit. For images from the structural autopsy see below.
The damage is only to the stairway and platform and I'm sure I can make repairs. Some parts will have to be completely replaced but the most important parts are intact. I may use this as an opporturity to individualize the structure a little with the rebuild.
At least she didn't damage the building.
MG
The damage is only to the stairway and platform and I'm sure I can make repairs. Some parts will have to be completely replaced but the most important parts are intact. I may use this as an opporturity to individualize the structure a little with the rebuild.
At least she didn't damage the building.
MG
Monday, January 9, 2012
Yard office, before and after.
I had to delay continued work on the conrete plant complex because I needed to finish some scenery immediately around the yard office. Otherwise I might damage parts of the conveyor supports in the conrete plant complex while trying to reach the area around the yard office. So I dug out some of the Silflor grass I had been using and did some scenery. Now before I did this I needed to build up the foundation of the office structure first. I want all the structures to have foundations that are recessed into the scenery. This way they don't look like they are resting on top of the scenery.
The image above shows the foam scenery base cut away for the structure foundation to recess into. The black and red object is a tab accuated wire quick connect to the lighting harness. I just push on each tab an slip in a wire from the 14v bulb I have mounted in the structure. This is the first time I've tried this devise so the jury is still out.
Before
After.
I am very please with this Silflor stuff, if you haven't tried it yet, go get one of the small starter packs.
The working time between the two previous images to add the grasses is about 15 min. Note: The concrete wall was already in place.
Sunday, December 25, 2011
Power House stack
I finally got around to doing some work on the smoke stack for the power house. Randy Costanza was very kind to give me an old stack from a Pola brewery kit. I was looking for a tall, hollow model representing a brick smoke stack. The one available from Walthers is only 10" tall, I was looking for something closer to 15+". The model Randy gave me is 16 1/4" and will do nicely. I need this stack to be hollow because I will be using my special smoke generator with it. I have purchased a flashing LED beacon kit for the stack which I will also include in the finished model. I hope the combination of flashing beacons and billowing smoke will be very cool.
The Pola smokestack model is made of 4 half circle sections which are glued together. Robust is not an adjective I would use to describe this kit, so some reinforcement is necessary. I also need to find and fit a plastic tube into the model to help with mounting to the module and piping the "smoke" from below the module. I located some 3/4" CPVC pipe which has an O.D. of 7/8". This is about 1/16 wider than I need at the very top of the stack so I sanded off the difference at the top 1 " to make the pipe fit into the stack.
The image above shows how the PVC pipe fits up the top of the model. I wrapped masking tape around the ends of the model to reinforce it while I was repeatedly test fitting the tube. The tape will be removed later.
The ring here is made of two layers of balsa wood glued crosswise for some strength. I'm only using it as a spacer at the bottom the the stack to keep the tube mostly centered .
The Pola smokestack model is made of 4 half circle sections which are glued together. Robust is not an adjective I would use to describe this kit, so some reinforcement is necessary. I also need to find and fit a plastic tube into the model to help with mounting to the module and piping the "smoke" from below the module. I located some 3/4" CPVC pipe which has an O.D. of 7/8". This is about 1/16 wider than I need at the very top of the stack so I sanded off the difference at the top 1 " to make the pipe fit into the stack.
The image above shows how the PVC pipe fits up the top of the model. I wrapped masking tape around the ends of the model to reinforce it while I was repeatedly test fitting the tube. The tape will be removed later.
The ring here is made of two layers of balsa wood glued crosswise for some strength. I'm only using it as a spacer at the bottom the the stack to keep the tube mostly centered .
I used an adhesive laytex caulk the secure the spacer ring and tube into the model.
The next part I have to work on is the base which will be square in shape. I have some scrap DPM wall sections I'll use to make it.
Friday, December 9, 2011
Aggragate transfer building/ maintainence shop
I used some 'Pikestuff" structure scraps to put together something for the aggragate transfer equipment. The structure is large enough to also have a small maintainance shop in the remaining half.
The image above shows the green and white structure at the low end of the conveyor.
I'll take some more photos when I get more done on the area around the structure.
Tuesday, December 6, 2011
Switch Targets
I finally added a few targets to the Caboose Industries ground throws I have on some of the switches.
At this point I only have 3 targets and may add only 1 or 2 more. Because of the density of the trackwork most the the switches will not have groundthrows.
At this point I only have 3 targets and may add only 1 or 2 more. Because of the density of the trackwork most the the switches will not have groundthrows.
The photo focus is a bit off but you can still see the effect.
A little rusting of the switch stand and everything looks ok.
Wednesday, November 9, 2011
The concrete mixing plant part 3
Above is the structure assembled with only a few pipes left to add.
The original Walthers structure had a closed storage bin with a number of pipes leading to the roof. I chose to remove the roof and add a home-made gravel distributing mechanism. The brace in front will hold up the conveyor structure.
Here is an idea of how the whole structure will look minus the additional supports for the conveyor.
Subscribe to:
Posts (Atom)


